PUC Case No. 20-0295-PET-POSTPONED- Site Visit re Petition of GMP for a CPG authorizing the installation of two Scada controlled capacitor Banks

In Re: Petition of Green Mountain Power for a certificate of public good, pursuant to 30 V.S.A. § 248, authorizing the installation of two SCADA controlled capacitor banks and other upgrades at the East St. Albans substation in St. Albans, Vermont

Before Andrew Flagg, Hearing Officer

Site Visit Tuesday, March 24, 2020 at 3:00 P.M. Parties are hereby requested to meet at the GMP East St. Albans Substation located at 14 Fairfield Hill Road in the Town of St. Albans, promptly at 3:00 P.M.

****POSTPONED******

As provided in the March 17, 2019, memorandum from Public Utility Commission Chair Roisman, the Commission is postponing all public hearings and site visits scheduled through the end of April.  Accordingly, the site visit currently scheduled in this case for Tuesday, March 24, 2020 at 3:00 P.M. is postponed until further notice.