Rule 5.500- Draft of Proposed Changes- Annotated
Rule 5.500- Order Opening Rulemaking
Press Release: Vermont Public Utility Commission Seeks Eight People to Serve on VSPC
Vermont System Planning Committee Is a Statewide Collaborative Addressing Electric Grid Reliability Planning
PRESS RELEASE: PUC Seeks Eight Members to Serve on VSPC
On June 11, 2018, the Vermont Public Utility Commission announced that eight members are being sought to serve on the Vermont System Planning Committee.
Commission Rule 5.500 - Standard Interconnection Application Form Instructions
Commission Rule 5.500 - Interconnection Application Form
This document contains the standard form to apply for the interconnection of generators to the electric distribution system.
Commission Rule 5.500 - Electric Generation - Interconnection Procedures
This document contains the text of Commission Rule 5.500, which governs the rules for the interconnection of generators to the electric distribution system.