Skip to main content

Workshop

PUC Case No. 20-0203-INV-Workshop-Low-income rate Investigation

In Re: Investigation into the establishment of reduced rates for low-income residential ratepayers of Vermont electric utilities

Before: Public Utility Commission Staff

Location: via Go To Meeting videoconference. The workshop will be recorded by a court reporter and will be open to the public.

Participants and members of the public may access the scheduling conference online at https://global.gotomeeting.com/join/317672653 or call in using the following information: Phone Number +1 (571) 317-3129   Access Code: 317-672-653 Participants may wish to download the GoToMeeting software application in advance of the workshop at https://global.gotomeeting.com/install/317672653   Guidance on how to join the meeting and system requirements may be found at  https://www.gotomeeting.com/meeting/online-meeting-support

PUC Case No. 21-0881-INV - Workshop - regarding jurisdiction over Green Mountain Power Corporation's Dams

RE: Workshop Investigation regarding jurisdiction over Green Mountain Power Corporation's Dams to discuss

(1) the appropriate criteria to investigate for each dam,
(2) the work required to gather the information needed for FERC to make its determinations,
and
(3) the timeframe GMP would need to complete the work.
The initial order scheduling this workshop proposed that it be held on May 27, 2021. However, due to scheduling conflicts, the Commission has moved the date to June 3, 2021.

Before: Public Utility Commission Staff


Location: via Go To Meeting videoconference. The workshop will be recorded by a court reporter and will be open to the public.


Participants and members of the public may access the workshop online at https://global.gotomeeting.com/join/515692533, or call in by telephone using the following information: phone number: +1 (571) 317-3116; access code: 515-692-533. Participants may wish to download the GoToMeeting software application in advance of the hearing at https://global.gotomeeting.com/install/515692533 Guidance on how to join the meeting and system requirements may be found at https://www.gotomeeting.com//online-meeting-support.

PUC Case No. 20-3304-PET Workshop re investigation to review the proposal of the Vermont Department of Public Service (“Department”) for a Sheffield-Highgate Export Interface constraint mitigation grid adjustor

RE: Petition of the Department of Public Service to open a proceeding to investigate a net-metering
Sheffield-Highgate Export Interface (“SHEI”) constraint mitigation grid adjustor

Before The Public Utility Commission

Location: The workshop will be held remotely using GoToMeeting.
Participants and members of the public may access the workshop online at
https://global.gotomeeting.com/join/878428701  or call in using the following information: phone
number +1 (646) 749-3129 , access code 878-428-701.  Participants may wish to download the
GoToMeeting software application in advance of the workshop at
https://global.gotomeeting.com/install/878428701 Guidance on how to join the meeting and system
requirements may be found at https://www.gotomeeting.com/meeting/online-meeting- support.
Commission staff will have questions addressing the following topics at the workshop:
(1) amount of the proposed grid adjustor and how the grid adjustor is structured, (2) the
applicability of the proposed grid adjustor, (3) potential exemptions from the proposed grid
adjustor, (4) triggers for revaluating the amount of the proposed grid adjustor, (5) whether there
should be any limits on the aggregate capacity of distributed generation interconnected in the
SHEI, and (6) mechanisms for distributing revenue raised by the grid adjustor.  Participants will
also be given time to raise additional topics and to ask questions of other participants.
There will be an opportunity for discussion about next steps in this proceeding.
 

 

PUC Case No. 19-0856-RULE Workshop re Proposed revisions to Vermont Public Utility Commission Rule 5.500



Re: This is a Vermont Public Utility Commission (“Commission”) proceeding to review Commission Rule 5.500, which governs the procedures for the interconnection of electric generation systems.
On April 19, 2021, at 10:00 A.M., Commission staff will conduct a virtual workshop to discuss next steps in this proceeding and to review the filings made in this proceeding to date. The first issue staff will discuss with stakeholders is whether this proceeding should continue working with the draft revised rule that was issued in May of 2019 or whether a different model should be developed. Commission staff will make a brief presentation describing the interconnection regulations adopted in other jurisdictions, including those that primarily implement interconnection procedures using orders and model tariffs as opposed to rule-based requirements. Stakeholders are requested to come prepared to address whether a rule-based interconnection process is best or whether a different model would be more appropriate.
Second, Commission staff also recognize the importance of harmonizing the net-metering certificate of public good (“CPG”) process governed by Rule 5.100 with the interconnection process contained in Rule 5.500. The draft rule language issued in 2019 clarifies that certain net-metering CPG registrations and applications are also interconnection applications.1 The draft interconnection rule has provisions specifically describing the process for reviewing interconnection applications for net-metering systems.2 The draft rule contemplated that the interconnection review and CPG process would happen concurrently for net-metering systems that apply using a registration form or application form.3 In contrast, larger net-metering
1 Draft Rule Section 5.505(A)(1).
2 Draft Rule 5.506(A).
3 The Commission had separately proposed in Case No. 19-0855-RULE to amend Rule 5.105 to make the review period for all registrations 30 days to be consistent with the proposed revisions to the interconnection rule. See 03/19/2021
Case No. 19-0856-RULE Page 2
systems that must file CPG petitions pursuant to Commission Rule 5.107 would file a separate interconnection application form before filing a CPG petition.
4 Stakeholders are requested to come prepared to address the appropriate interconnection process for net-metering systems and whether that process should be part of or separate from the CPG process as well as the timing of the interconnection application in relation to the CPG process.
Third, staff will also review the specific comments filed by stakeholders in June of 2019. This will help inform how the issues raised in those comments can be best addressed in the next iteration of proposed rule revisions.
If any stakeholder would like to make its own presentation about potential models for the interconnection rule or about the issues described in this order, they should make a filing in this case by no later than April 9, 2021. Please include a description of the topics that will be presented, an estimate of time required, and a copy of any presentation materials to be used.

Before The Public Utility Commission


Participants and members of the public may access the workshop online at https://global.gotomeeting.com/join/927758069 or call in using the following information: Phone Number +1 (646) 749-3129 Access Code: 927-758-069 Participants may wish to download the GoTo Meeting software application in advance of the workshop at https://global.gotomeeting.com/install/927758069 919789445 Guidance on how to join the meeting and system requirements may be found at https://www.gotomeeting.com/meeting/online-meeting-support
 

PUC Case No. 19-4625-INV Second Workshop re Commission Rule 8.313 and the line extension policies and tariffs of cable operators in Vermont


RE: Investigation concerning matters related to Vermont Public Utility Commission Rule 8.313 and the line extension policies and tariffs of cable operators in Vermont

Before The Vermont Public Utility Commission

Participants and members of the public may access the workshop online at https://global.gotomeeting.com/join/151636549 or call in using the following information: Phone Number +1 (646) 749-3129 Access Code: 151-636-549 Participants may wish to download the GoToMeeting software application in advance of the workshop at https://global.gotomeeting.com/install/151636549 Guidance on how to join the meeting and system requirements may be found at https://www.gotomeeting.com/meeting/online-meeting-support
 

CANCELLED TO Be RESCHEDULED PUC Case No. 20-0203-INV Workshop Re Low-income rate investigation

In Re: Low-income rate Investigation

Before The Vermont Public Utility Commission

The Vermont Public Utility Commission will convene a Workshop in this proceeding on Thursday, March
25, 2021, from 1:30 P.M. – 3:30 P.M.
The workshop will be held in the via Go To Meeting videoconference.  The workshop will be recorded
by a court reporter and will be open to the public.

Participants and members of the public may access the scheduling conference online at
https://global.gotomeeting.com/join/191501957     or call in using the following information: Phone
Number +1 (571) 317-3116  Access Code: 191-501-957 Participants may wish to download the
GoToMeeting software application in advance of the workshop at
https://global.gotomeeting.com/install/191501957   Guidance on how to join the meeting and system
requirements may be found at  https://www.gotomeeting.com/meeting/online-meeting- support

 

 

 

 

 

 

 

 

PUC Case No. 21-0167-PET Workshop re VGS/ 2020 IRP

In Re: Petition of Vermont Gas Systems, Inc. for approval of its 2020 Integrated Resource Plan

Before: Vermont Public Utility Commission

Location: The workshop will be held via GoToMeeting.  The workshop will be recorded by a court reporter and will be open to the public. 

Participants and members of the public may access the oral argument online at https://global.gotomeeting.com/join/294554053   or call in using the following information: Phone Number: +1 (571) 317-3129 Access Code: 294-554-053 Participants may wish to download the GoToMeeting software application in advance of the workshop at https://global.gotomeeting.com/install/294554053. Guidance on how to join the meeting and system requirements may be found at https://www.gotomeeting.com/meeting/online-meeting-support.

PUC Case NO. 19-4625-INV Workshop re to review matters related to Vermont Public Utility Commission Rule 8.313

In Re: This case is an informal proceeding to review matters related to Commission Rule 8.313 (“Line Extension Rule”) and the line extension policies and tariffs of cable operators in Vermont. On September 9, 2020, the Vermont Public Utility Commission (“Commission”) requested information from the Department of Public Service and cable operators about the line-extension request process. Responses were due on January 22, 2021, and reply comments were due February 5, 2021.

Before Vermont Public Utility Commission staff

Location: The workshop will conducted using GoToMeeting, participants may access the workshop using the following link:
Participants and members of the public may access the scheduling conference online at https://global.gotomeeting.com/join/919789445 or call in using the following information: Phone Number +1 (571) 317-3116 Access Code: 919-789-445 Participants may wish to download the GoToMeeting software application in advance of the workshop at https://global.gotomeeting.com/install/919789445 Guidance on how to join the meeting and system requirements may be found at https://www.gotomeeting.com/meeting/online-meeting-support
 

PUC Case No. 20-2369-RULE Workshop re Proposed Revisions To Vermont Public Utility Commision Rule 2

In RE: Proposed Revisions To Vermont Public Utility Commission Rule 2

Before The Vermont Public Utility Commission

Location: The workshop will be held remotely via GoToMeeting and will begin at 9:30 AM and continue until 3:30 PM, with regular breaks throughout.
This workshop will be devoted primarily to addressing the suggestion by several commenters that we eliminate all references to the Vermont Rules of Civil Procedure and instead incorporate relevant rules into Commission Rule 2. If participants or Commission staff wish to raise other issues during this workshop, and if there is time to do so, that will also be allowed.
Participants and members of the public may access the workshop online at https://global.gotomeeting.com/join/126546781, or call in using the following information: Phone Number: +1 (646) 749-3129; Access Code: 126-546-781. Participants may wish to download the GoToMeeting software application in advance of the workshop at https://global.gotomeeting.com/install/126546781. Guidance on how to join the meeting and system requirements may be found at https://www.gotomeeting.com/meeting/online-meeting-support.

 

PUC Case No. 20-2369-Rule Workshop re Proposed Revisions To Vermont Public Utility Commission Rule 2

In Re: Proposed revisions to Vermont Public Utility Commission Rule 2
 

Before: General Counsel Kyle Landis-Marinello

Location:  The workshop will be held via GoToMeeting.  The workshop will be recorded by a court reporter and will be open to the public. 

Participants and members of the public may access the workshop online at https://global.gotomeeting.com/join/563580781, or call in using the following information:  Phone Number: 1-866-899-4679; Access Code: 563-580-781.  Participants may wish to download the GoToMeeting software application in advance of the workshop at https://global.gotomeeting.com/install/563580781. Guidance on how to join the meeting and system requirements may be found at https://www.gotomeeting.com/meeting/online-meeting-support

Subscribe to Workshop