This document contains the winter operating protocol required by Condition 10 of the CPG issued to the Georgia Mountain Community Wind project (Docket 7508).
This document contains the post-construction sound monitoring protocol required by Condition 25 of the CPG and a subsequent clarifying order for the Georgia Mountain Community Wind project (Docket 7508). The protocol also includes complaint resolution procedures.