PDF

PDF format documents

Net-Metering Checklist Makes It Easier to Complete CPG Applications

31 May 2018
Today, the PUC issued this press release announcing a newly published net-metering checklist. Now, anyone applying for a certificate of public good (“CPG”) for a ground-mounted net-metering system with a capacity of more than 50 kW can ensure all documents are completed accurately before submitting them to the PUC. The PUC Net-Metering Web page contains details about the net-metering program, including useful links to statutes, forms and instructional materials.

Applicant checklist

30 May 2018
This checklist is for applicants requesting a certificate of public good for a ground-mounted net-metering system with a capacity that is greater than 50 kW.

Deerfield final Monitoring Protocol

15 May 2018
This document contains the final monitoring protocol required by Condition 30 of the amended CPG issued to the Deerfield Wind project (Docket 7250). It also contains complaint resolution procedures.

Public Comments on Vermont Gas System, Inc. Proposed Rate Adjustment

24 April 2018
One member of the public who attended the hearing stated that, while the overall rate reduction was appreciated, the 4 percent increase in the daily access and distribution charges afforded too high a rate-of-return for Vermont Gas System, Inc. and should instead be 1.8 percent, or more in line with inflation.

Pages

Subscribe to RSS - PDF

Contact Information

Judith C. Whitney
Clerk of the Commission
112 State Street
Montpelier, VT  05620-2701
(802) 828-2358
Email the Clerk │Office Location and Parking 
Public Records Database and PUC Records Officer Contact Information

Cases and ePUC

Calendar

Forms

Complaints

How do I?

Statutes and Rules