Press Release: Today the Vermont Public Utility Commission (“PUC”) made appointments to four of the five public seats on the Vermont System Planning Committee.
On June 11, 2018, the Vermont Public Utility Commission announced that eight members are being sought to serve on the Vermont System Planning Committee.
Public Hearing Transcript: May 9, 2018, at city Hall in Burlington, VT │Regarding the Joint Petition for Approvals by Champlain Broadband, LLC; City of Burlington d/b/a Burlington Telecom; Blue Water Holdings, LLC
PUC Case #18-0491-PET
Today, the PUC issued this press release announcing a newly published net-metering checklist. Now, anyone applying for a certificate of public good (“CPG”) for a ground-mounted net-metering system with a capacity of more than 50 kW can ensure all documents are completed accurately before submitting them to the PUC. The PUC Net-Metering Web page contains details about the net-metering program, including useful links to statutes, forms and instructional materials.
Applications requesting a certificate of public good for a ground-mounted net-metering system with a capacity that is greater than 50 kW should use this document.
This document contains the final monitoring protocol required by Condition 30 of the amended CPG issued to the Deerfield Wind project (Docket 7250). It also contains complaint resolution procedures.
The May 8, 2018, memo from ePUC Project Manager Ann Bishop describes an easier way to obtain ePUC document numbers for inclusion on lists of pre-filed testimony and exhibits provided at evidentiary hearings.